This system is the world’s largest in the automotive industry. The panels are located at six covered, ISO 14001-certified sites – Douai, Maubeuge, Flins, Batilly, Sandouville and Cléon – in delivery and shipping centers and employee parking areas.
The entire surface area is covered with photovoltaic panels developing total power of 59 MW and able to produce 52,600 MWh of electricity a year, enough for a town of 15,000 people. On average, photovoltaic solar plants have total power of around 1 MW.
The project was developed by Renault, project initiator and coordinator, in its role as lessor, together with its partners Gestamp Solar and Coruscant (Cléon only), in their role as operational project managers.
The system is also being rolled out internationally. The Group is to set up nearly 100,000 square meters of photovoltaic panels at the Valladolid and Palencia plants through an agreement with Cenit Solar, while feasibility studies are underway in Slovenia, Morocco, Brazil, Colombia, Chile and Romania. Further projects are being introduced at the Busan site in South Korea, with 300,000 square meters scheduled for finalization in December 2012.